Industry dynamic

Potting Adhesive "Won't Stick, Won't Cure"? Tensan Releases On-Site Problem-Solving Reference Checklist

2026-07-21 - Leave me a message

Silicone potting adhesives are widely used in new energy vehicle electronic controls, photovoltaic inverters, energy storage BMS, and other applications. However, bonding failure and curing abnormalities reported from production lines remain persistently high. Based on on-site technical service data collected over the past two years, Tensan has compiled a self-check reference checklist for potting process issues for industry reference.

I. Incomplete Curing: Three Questions for Rapid Diagnosis

Symptom
Possible Cause
Tensan Recommendation
Tacky surface, insufficient hardness
A:B mixing ratio deviation too large
Switch to automatic metering equipment, control error within ±1%
Localized flow-like state, uneven curing
Static mixing tube too long or not replaced regularly
Match tube diameter to flow rate; replace every shift
Frequent non-curing in winter
Ambient temperature <15°C, reaction rate drops sharply
Heat work area to 23±3°C; preheat adhesive to 25°C before mixing
Thin coating areas (<1mm) remain uncured for long periods
Insufficient exothermic heat, rapid heat dissipation
Apply post-curing in 80-100°C oven for 30-60 minutes

II. Interfacial Delamination: Four Scenarios for Targeted Identification

Symptom
Possible Cause
Tensan Recommendation
Complete peeling between adhesive layer and PCB board
Residual fingerprints/flux/dust on board surface
Add plasma cleaning step before production
No adhesion at all on PP/PE housings
Surface energy too low (<34 dynes/cm)Surface energy too low (<34 dynes/cm)
Flame or corona treatment, increase to ≥38 dynes/cm
Edge warping after curingEdge warping after curing
Excessive shrinkage stress from fast-cure system
Switch to low-shrinkage slow-cure formulation + stepwise heating process
Cracks appearing after thermal shock testing
Rapid cooling after curing, instantaneous release of thermal stress
Allow slow cooling to room temperature after curing before transferring

III. Tensan's "Three-Step" Closed-Loop Improvement Solution

For the high-frequency issues mentioned above, Tensan has established a standardized "Diagnose - Improve - Solidify" three-step service process:

  • Diagnose: On-site technical team assesses proportioning equipment, mixing systems, oven temperature field distribution, and pretreatment processes; produces a problem checklist;
  • Improve: Develops customized process parameter packages for weak links (including quantitative indicators such as temperature curves, mixing speed, pretreatment intensity, etc.);
  • Solidify: Assists clients in establishing standardized operating procedures and inspection systems to convert improvements into long-term capabilities.


IV. One Sentence Summary

The baseline of potting quality is not guaranteed by good adhesive alone — it's secured by good process discipline. Tensan: not just an adhesive supplier, but your potting process partner every step of the way.




Send Inquiry


X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept